Project Details
This page displays current information for project DIME:993264.
Project Information
| Project Identifiers | Project ID: 993264 Permit Numbers: 0320NSN0131 0321NRT1120 0322NRT0756 0322NRT0775 |
|---|---|
| DIST-CO-RTE-PM | 03---3.25 |
| Award Date | 11/25/2020 |
| Closeout Date | 08/11/2023 |
| Work Description | Install signal at the EB50 Off and On ramps on bass Lake Road |
| Location Description | Bass Lake Road, El Dorado Hills |
| QA Service Level | 1 (Verified on 09/21/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mali.karimi@dot.ca.gov | Malihe Karimi Tararani | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
