Project Details
This page displays current information for project DEA: 051F8104.
Project Information
| Project Identifiers | Project ID: 993257 DEA: 051F8104 EFIS: 0514000063 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-1-M33.1 |
| Award Date | 10/22/2021 |
| Closeout Date | 01/12/2023 |
| Work Description | INSTALL SHEET PILE WALL AND ROCK SLOPE PROTECTION. |
| Location Description | SANTA BARBARA COUNTY NEAR LOMPOC AT SAN ANTONIO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/20/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thomas.petersen@dot.ca.gov | Thomas Petersen | Resident Engineer | Caltrans RE DB |
| raymond.barajas@dot.ca.gov | Ray Barajas | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-11-09-1 | 11/09/2022 | 11/11/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2022-08-30-9 | 08/30/2022 | 09/05/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
