Project Details

This page displays current information for project DEA: 100P5404.

Project Information

Project IdentifiersProject ID: 993239
DEA: 100P5404
EFIS: 1013000251
DIST-CO-RTE-PM10-SJ,STA-5,99-6.2/6.6,R17.7/R18.1
Award Date10/29/2021
Closeout Date08/30/2023
Work DescriptionREMOVE & PLACE STRUCTURAL CONCRETE BRIDGE; AND PLACE CONCRETE BARRIER.
Location DescriptionSAN JOAQUIN AND STANISLAUS COUNTIES ON ROUTE 5 FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF ROUTE 5/33 SEPARATION AND OVERHEAD AND ON ROUTE 99 FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF WEST MODESTO OVERHEAD
QA Service Level1 (Verified on 09/27/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
ariel.mendoza@dot.ca.govAriel MendozaResident EngineerCaltrans RE DB
ron.matin@dot.ca.govRon MatinStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 23 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-04-20-9704/20/202304/20/2023Quality ControlConcreteView
2023-04-20-3504/20/202304/20/2023Quality ControlConcreteView
2023-04-20-3404/20/202304/20/2023Quality ControlAggregateView
2023-04-20-3304/20/202304/20/2023Quality ControlAggregateView
2023-04-17-1904/17/202304/17/2023Quality ControlConcreteView
2023-04-17-1804/17/202304/17/2023Quality ControlAggregateView
2023-04-17-1704/17/202304/17/2023Quality ControlAggregateView
2023-03-30-5903/30/202303/30/2023Quality ControlConcreteView
2023-03-30-5803/30/202304/04/2023Quality ControlAggregateView
2023-03-30-5703/30/202304/04/2023Quality ControlAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month

Jan 2025Feb 2025Mar 2025Apr 2025May 2025Jun 2025Jul 2025Aug 2025Sep 2025Oct 2025Nov 2025Dec 20250123456SamplesTests

Number of Samples

17.4%82.6%CT D10 - District 10 Materials Laboratory (17.4%)RMA Group - Rancho Cordova (82.6%)

Sample Types

17.4%82.6%Quality Assurance (17.4%)Quality Control (82.6%)

Number of Tests

93%CT D10 - District 10 Materials Laboratory (7%)RMA Group - Rancho Cordova (93%)

Test Types

93%Quality Assurance (7%)Quality Control (93%)

Material Types

52.2%30.4%17.4%Aggregate (52.2%)Concrete (30.4%)Hot Mix Asphalt (17.4%)

Test Methods

21.1%10.5%10.5%10.5%12.3%14%CTM 202 (21.1%)CTM 217 (10.5%)CTM 504 (1.8%)CTM 226 (10.5%)CTM 227 (10.5%)ASTM C 143 (3.5%)AASHTO T 209 (1.8%)AASHTO T 308 (5.3%)CTM 557 (12.3%)CTM 521 (14%)