Project Details
This page displays current information for project DIME:993219.
Project Information
| Project Identifiers | Project ID: 993219 Permit Numbers: 05216MC0027 05216RT0682 05216RT0862 |
|---|---|
| DIST-CO-RTE-PM | 05---2.138/-1 |
| Award Date | 04/27/2021 |
| Closeout Date | 09/23/2022 |
| Work Description | Remove & Replace existing driveway, 588' of curb, gutter, sidewalk. Remove & Replace traffic signal poles and mast arms, including new type C loops at driveway and striping. Connect to existing sewer via directional bore and existing water line. Re-time existing traffic signals. |
| Location Description | 975 Main St. , Watsonville |
| QA Service Level | 1 (Verified on 09/20/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| david.ontiveros@dot.ca.gov | David Ontiveros | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
