Project Details
This page displays current information for project DIME:993163.
Project Information
| Project Identifiers | Project ID: 993163 Permit Numbers: 0321AOP0723 0322ARD0813 0322ARD0815 |
|---|---|
| DIST-CO-RTE-PM | 03---13.1/-1 |
| Award Date | 06/01/2021 |
| Closeout Date | 08/11/2023 |
| Work Description | Construct a single lane roundabout at the current stop controlled intersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)as per the attached plans and documents submitted to the Caltrans Encroachment Office. |
| Location Description | I-80 EB Ramps at Donner Pass Road, Truckee |
| QA Service Level | 1 (Verified on 07/29/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jaret.montplaisir@dot.ca.gov | Jaret Montplaisir | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods