Project Details
This page displays current information for project DEA: 07319104.
Project Information
| Project Identifiers | Project ID: 993162 DEA: 07319104 EFIS: 0716000017 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-91-R11.8 |
| Award Date | 02/10/2022 |
| Closeout Date | 01/11/2024 |
| Work Description | ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP. |
| Location Description | LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR |
| QA Service Level | 1 (Verified on 11/30/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 34 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-01-13-38 | 01/13/2023 | 01/18/2023 | Department Acceptance | Aggregate | View |
| 2023-01-14-3 | 01/14/2023 | 01/15/2023 | Department Acceptance | Concrete | View |
| 2023-01-14-2 | 01/14/2023 | 01/15/2023 | Department Acceptance | Concrete | View |
| 2022-12-21-76 | 12/21/2022 | 12/22/2022 | Quality Assurance | Concrete | View |
| 2022-12-21-72 | 12/21/2022 | 12/22/2022 | Quality Assurance | Concrete | View |
| 2023-01-13-3 | 01/13/2023 | 01/13/2023 | Department Acceptance | Aggregate | View |
| 2023-01-12-1 | 01/12/2023 | 01/12/2023 | Department Acceptance | Soil | View |
| 2022-12-21-46 | 12/21/2022 | 12/22/2022 | Department Acceptance | Aggregate | View |
| 2022-12-20-39 | 12/20/2022 | 12/22/2022 | Department Acceptance | Aggregate | View |
| 2022-11-18-60 | 11/18/2022 | 11/18/2022 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
