Project Details

This page displays current information for project DEA: 08323034.

Project Information

Project IdentifiersProject ID: 993159
DEA: 08323034
EFIS: 0812000059
COOP: 081703
DIST-CO-RTE-PM08-RIV-60-18.8/19.6
Award Date05/04/2021
Closeout DateNot set
Work DescriptionProject Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configuration
Location DescriptionSR-60 & Moreno Beach Interchange
QA Service Level2 (Verified on 07/27/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
rasanayagam.nitharsan@dot.ca.govNitha NitharsanResident EngineerCaltrans RE DB
jrojas@falcon-ca.comJuan RojasOversight Resident EngineerCaltrans REO DB
greg.Alexander@dot.ca.govGreg AlexanderStructural RepresentativeCaltrans SR DB
aalina@falcon-ca.comAl AlinaOversight Structural RepresentativeCaltrans SRO DB
jennifer.olarte@dot.ca.govJennifer OlarteMETS REPCaltrans METS REP DB
prakash.gowda@dot.ca.govPrakash GowdaDistrict Materials Engineer - Field Lab FontanaCaltrans District Materials Engineer
zihui.li@dot.ca.govZihui LiDistrict Materials Engineer - SRL PCC/Agg/Soils LabCaltrans District Materials Engineer
cristina.paredes@dot.ca.govCristina ParedesDistrict Materials Engineer - SRL HMA and Binder LabsCaltrans District Materials Engineer
sittampalam.sathiskumar@dot.ca.govSittampalam SathiskumarDistrict Materials Engineer - DesignCaltrans District Materials Engineer
kaushalkumar.talati@dot.ca.govKaushalkumar TalatiDistrict Materials Engineer - Field Lab Barstow and HesperiaCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 1-4 of 4 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-05-31-7205/31/202306/16/2023VerificationAsphalt Rubber BinderView
2023-05-31-6505/31/202306/16/2023VerificationCrumb Rubber ModifierView
2023-05-31-6405/31/202306/16/2023VerificationCrumb Rubber ModifierView
2023-05-31-6305/31/202306/16/2023VerificationAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods