Project Details
This page displays current information for project DIME:993142.
Project Information
| Project Identifiers | Project ID: 993142 Permit Numbers: 08196CD0860 08216RT0988 |
|---|---|
| DIST-CO-RTE-PM | 08---4.7/-1 |
| Award Date | 06/01/2019 |
| Closeout Date | Not set |
| Work Description | Enter onto State Route 79 (SR-79) right-of-way at Murrieta Hot Springs Road in the Cityof Murrieta to construct widened pavement, curb and gutter, sidewalk, curb ramp, installstreet light, restripe, modify signal, and install new landscaping/irrigation as per plansdate stamped, August 11, 2020 by t |
| Location Description | Winchester Road, Murrieta |
| QA Service Level | 1 (Verified on 09/08/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Ardo.Narvasa@dot.ca.gov | ARDO NARVASA | Resident Engineer | Caltrans RE DB |
| Ardo.Narvasa@dot.ca.gov | Ardo Narvasa | Oversight Resident Engineer | Caltrans REO DB |
| roger.khoudessian@dot.ca.gov | Roger Khoudessian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
