Project Details
This page displays current information for project DEA: 032H62U4.
Project Information
| Project Identifiers | Project ID: 993121 DEA: 032H62U4 EFIS: 0319000021 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV-20-25.6/39.8 |
| Award Date | 01/28/2022 |
| Closeout Date | 07/15/2025 |
| Work Description | ROADWAY EXCAVATION, HMA (TYPE A) WITH CLASS 2 AB, RCB CULVERT AND RCP. |
| Location Description | NEVADA COUNTY NEAR OMEGA AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CONSERVATION ROAD (WASHINGTON RIDGE ROAD) TO 1.2 MILES WEST OF ZEIBRIGHT ROAD |
| QA Service Level | 1 (Verified on 07/26/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jeff.d.johnson@dot.ca.gov | Jeff Johnson | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 63 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-10-14-12 | 10/14/2023 | 10/19/2023 | Quality Assurance | Asphalt Binder | View |
| 2023-10-14-11 | 10/14/2023 | 10/19/2023 | Quality Assurance | Asphalt Binder | View |
| 2023-10-14-10 | 10/14/2023 | 10/15/2023 | Quality Assurance | Asphalt Binder | View |
| 2023-10-13-21 | 10/13/2023 | 10/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-14-3 | 10/14/2023 | 10/14/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-03-66 | 10/03/2023 | 10/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-01-12 | 10/01/2023 | 10/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-09-29 | 10/09/2023 | 10/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-08-7 | 10/08/2023 | 10/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-10-07-8 | 10/07/2023 | 10/07/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
