Project Details
This page displays current information for project DEA: 101C3304.
Project Information
| Project Identifiers | Project ID: 993118 DEA: 101C3304 EFIS: 1014000146 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-205-R4.6/R9.0 |
| Award Date | 04/05/2022 |
| Closeout Date | Not set |
| Work Description | Widening bridges, ramps and roadway. SR205 SMART CORRIDOR - PHASE 2 |
| Location Description | On state highway in San Joaquin County in and near Tracy from Janney Overhead to 1.3 miles east of MacArthur Drive Overcrossing. |
| QA Service Level | 1 (Verified on 07/06/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jim.benton@dot.ca.gov | Jim Benton | Resident Engineer | Caltrans RE DB |
| ron.matin@dot.ca.gov | Ron Matin | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 29 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-11-12-44 | 11/12/2024 | 11/12/2024 | Quality Control | Concrete | View |
| 2024-10-28-59 | 10/28/2024 | 10/28/2024 | Quality Control | Concrete | View |
| 2024-10-28-58 | 10/28/2024 | 10/28/2024 | Quality Control | Concrete | View |
| 2024-10-28-57 | 10/28/2024 | 10/28/2024 | Quality Control | Concrete | View |
| 2024-10-28-56 | 10/28/2024 | 10/28/2024 | Quality Control | Concrete | View |
| 2023-11-07-67 | 11/07/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
| 2023-11-07-66 | 11/07/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
| 2023-11-01-71 | 11/01/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
| 2023-11-02-47 | 11/02/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
| 2023-10-31-68 | 10/31/2023 | 11/13/2023 | Quality Control | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
