Project Details
This page displays current information for project DIME:795.
Project Information
| Project Identifiers | Project ID: 795 Permit Numbers: 0309NSN0737 0309NRD0993 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-50-15.81/15.812 |
| Award Date | 09/11/2009 |
| Closeout Date | 09/17/2014 |
| Work Description | U.S. 50 on ramp (WB) will be widened approximately three feet to the east. The existing pavement on Hazel Avenue will be overlaid with 2" ARHM-GG. The maximum excavation depth (30.5") will occur on the SW shoulder between station 59+33.28 to 63+42.64. Along with the widening, curb, gutter |
| Location Description | Hazel, Sacramento |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
