Project Details
This page displays current information for project DEA: 034E28U4.
Project Information
Project Identifiers | Project ID: 784 DEA: 034E28U4 Permit Numbers: 0309NDP0997 0309NMC0450 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-14.2/15.7 |
Award Date | 07/07/2009 |
Closeout Date | 09/17/2014 |
Work Description | Construct roadway improvements to State Hwy 50 interchange between Missouri Flat Road and Forni Road in the city of Placerville. Roadway improvements include widening Weber Creek Bridge, constructing auxiliary lanes, improving drainage, constructing retaining walls, installing traffic signals and i |
Location Description | Missouri Flat Road, Placerville |
QA Service Level | 1 (Verified on 10/10/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
keith.flaherty@valicooper.com | Keith Flaherty | Oversight Resident Engineer | Caltrans REO DB |
aradhana.kochar@edcgov.us | Aradhana Kochar | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods