Project Details
This page displays current information for project DEA: 040A1854.
Project Information
| Project Identifiers | Project ID: 7826 DEA: 040A1854 EFIS: 0400020652 COOP: 042363 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-7.1/8.1 |
| Award Date | 02/12/2013 |
| Closeout Date | 01/03/2017 |
| Work Description | RECONSTRUCT INTERCHANGE |
| Location Description | SONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING |
| QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hal.j.streater@dot.ca.gov | Hal Streater | Resident Engineer | Caltrans RE DB |
| jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-08-07-7 | 08/07/2015 | 08/14/2015 | Quality Control | Concrete | View |
| 2015-04-27-15 | 04/27/2015 | 04/27/2015 | Verification | Job Mix Formula Partial | View |
| 2015-04-09-8 | 04/09/2015 | 04/15/2015 | Verification | Job Mix Formula Partial | View |
| 2015-01-28-4 | 01/28/2015 | 02/24/2015 | Quality Control | Concrete | View |
| 2015-01-28-3 | 01/28/2015 | 02/24/2015 | Quality Control | Concrete | View |
| 2015-01-28-2 | 01/28/2015 | 02/24/2015 | Quality Control | Concrete | View |
| 2014-11-25-2 | 11/25/2014 | 12/05/2014 | Quality Control | Concrete | View |
| 2014-10-24-4 | 10/24/2014 | 10/24/2014 | Verification | Concrete | View |
| 2014-09-08-1 | 09/08/2014 | 09/11/2014 | Quality Control | Concrete | View |
| 2014-09-05-3 | 09/05/2014 | 09/09/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
