Project Details
This page displays current information for project DEA: 060C1104.
Project Information
| Project Identifiers | Project ID: 7579 DEA: 060C1104 EFIS: 0600000934 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-180-R58.4/R60.4 |
| Award Date | 01/12/2012 |
| Closeout Date | 04/24/2018 |
| Work Description | BRAIDED RAMPS |
| Location Description | FRESNO COUNTY IN FRESNO ON ROUTE 180 FROM INTERCHANGE WITH ROUTE 41 TO INTERCHANGE WITH ROUTE 168 |
| QA Service Level | 1 (Verified on 12/20/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| alan_vong@dot.ca.gov | Alan Vong | Resident Engineer | Caltrans RE DB |
| balvarez@walshgroup.com | BEN ALVAREZ | Oversight Resident Engineer | Caltrans REO DB |
| michael.trinh@dot.ca.gov | Michael Trinh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
