Project Details
This page displays current information for project DEA: 08432714.
Project Information
| Project Identifiers | Project ID: 7534 DEA: 08432714 EFIS: 0800000670 Permit Numbers: 0812NMC0267 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV--6.6/7.8 |
| Award Date | 05/01/2012 |
| Closeout Date | 07/31/2018 |
| Work Description | Enter onto Interstate 15 between Winchester Road (State Route 79) and north of French Valley Parkway in & near the City of Temecula, to construct new and/or widen freeway exit ramps, including new concrete retaining walls & a MSE wall construction |
| Location Description | Interstate 15, Temecula |
| QA Service Level | 1 (Verified on 09/11/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| chad.yang@dot.ca.gov | Chad Yang | Resident Engineer | Caltrans RE DB |
| Jrevels@harris-assoc.com | John Revels | Oversight Resident Engineer | Caltrans REO DB |
| sonny_cao@dot.ca.gov | Sonny Cao | Structural Representative | Caltrans SR DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
