Project Details
This page displays current information for project DEA: 080E5204.
Project Information
| Project Identifiers | Project ID: 7515 DEA: 080E5204 EFIS: 0800000088 Permit Numbers: 0811NMC0804 0812NDP5204 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV--R32.32/R35.95 |
| Award Date | 10/26/2011 |
| Closeout Date | 10/26/2012 |
| Work Description | Enter onto Interstate 215 right-of-way at Van Buren Boulevard Interchange to reconstruct the interchange including but not limited to realign freeway ramps, replace overcrossing and overhead bridges, construct retaining walls, drainage facilities, signal |
| Location Description | Near the city of Riverside, on Interstate 215 at Van Buren Boulevard |
| QA Service Level | 1 (Verified on 09/03/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| wfaqih@falcon-ca.com | Wael Faqih | Oversight Resident Engineer | Caltrans REO DB |
| shukri_abouazra@dot.ca.gov | Shukri Abouazra | Structural Representative | Caltrans SR DB |
| vanburen@falcon-ca.com | Please send | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
