Project Details
This page displays current information for project DEA: 042908E4.
Project Information
| Project Identifiers | Project ID: 7497 DEA: 042908E4 EFIS: 0400021249 COOP: 042396A3 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-580-14.6/21.6 |
| Award Date | 12/31/1969 |
| Closeout Date | 09/28/2016 |
| Work Description | ROADWAY WIDENING AND REHABILITATION |
| Location Description | ALAMEDA COUNTY IN LIVERMORE, PLEASANTON, AND DUBLIN FROM 0.3 MILE EAST OF AIRWAY BOULEVARD OVERCROSSING TO 0.2 MILE WEST OF SAN RAMON/FOOTHILL ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 10/08/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| satinder.grewal@dot.ca.gov | Satinder Grewal | Resident Engineer | Caltrans RE DB |
| jennifer.man@dot.ca.gov | Jennifer Mann | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-10-07-8 | 10/07/2015 | 10/14/2015 | Quality Control | Concrete | View |
| 2015-09-04-2 | 09/04/2015 | 09/10/2015 | Quality Control | Concrete | View |
| 2015-09-04-1 | 09/04/2015 | 09/10/2015 | Quality Control | Concrete | View |
| 2015-05-22-12 | 05/22/2015 | 06/12/2015 | Quality Control | Concrete | View |
| 2015-05-28-4 | 05/28/2015 | 06/12/2015 | Quality Control | Concrete | View |
| 2015-05-26-6 | 05/26/2015 | 06/12/2015 | Quality Control | Concrete | View |
| 2015-05-22-11 | 05/22/2015 | 06/12/2015 | Quality Control | Concrete | View |
| 2015-03-13-10 | 03/13/2015 | 04/03/2015 | Verification | Concrete | View |
| 2015-03-16-1 | 03/16/2015 | 04/03/2015 | Verification | Concrete | View |
| 2015-01-20-4 | 01/20/2015 | 01/23/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
