Project Details
This page displays current information for project DEA: 04445604.
Project Information
| Project Identifiers | Project ID: 7475 DEA: 04445604 EFIS: 0400001081 COOP: 042434 Permit Numbers: 0412NMC0872 0412NDP1643 |
|---|---|
| DIST-CO-RTE-PM | 04-SCL-280-5.1/5.2,0.0/0.8 |
| Award Date | Not set |
| Closeout Date | 05/07/2019 |
| Work Description | The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, widening |
| Location Description | In San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing |
| QA Service Level | 2 (Verified on 12/11/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| minh.hinh@dot.ca.gov | Minh Hinh | Resident Engineer | Caltrans RE DB |
| Brian.Wiedmann@hatchmott.com | Brian Wiedmann | Oversight Resident Engineer | Caltrans REO DB |
| ali_kamalvand@dot.ca.gov | Ali Kamalvand | Structural Representative | Caltrans SR DB |
| Ismael.Ramirez@vta.org | Ismael Ramirez | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
