Project Details
This page displays current information for project DEA: 043A7774.
Project Information
| Project Identifiers | Project ID: 7466 DEA: 043A7774 EFIS: 0400002044 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA,CC-80-Ala2.3/8.0CC0,0/13.1 |
| Award Date | 10/12/2012 |
| Closeout Date | 09/28/2016 |
| Work Description | INSTALL OVERHEAD SIGN STRUCTURES AND TRAFFIC OPERATIONS SYSTEM |
| Location Description | ALAMEDA AND CONTRA COSTA COUNTIES AT VARIOUS LOCATIONS FROM 0.1 MILE WEST OF POWELL STREET UNDERCROSSING TO 0.5 MILE EAST CUMMINGS SKYWAY OVERCROSSING |
| QA Service Level | 1 (Verified on 09/24/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mohammad.rahmani@dot.ca.gov | Mohammad Rahmani | Resident Engineer | Caltrans RE DB |
| mathew_abel@dot.ca.gov | Matthew Abel | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-06-03-4 | 06/03/2015 | 06/04/2015 | Verification | Concrete | View |
| 2015-06-01-3 | 06/01/2015 | 06/04/2015 | Verification | Concrete | View |
| 2015-04-14-1 | 04/14/2015 | 04/16/2015 | Quality Control | Concrete | View |
| 2014-11-12-4 | 11/12/2014 | 11/17/2014 | Quality Control | Concrete | View |
| 2014-11-12-3 | 11/12/2014 | 11/17/2014 | Quality Control | Concrete | View |
| 2014-10-09-5 | 10/09/2014 | 10/23/2014 | Quality Control | Concrete | View |
| 2014-09-16-5 | 09/16/2014 | 09/22/2014 | Verification | Concrete | View |
| 2014-09-16-4 | 09/16/2014 | 09/22/2014 | Verification | Concrete | View |
| 2014-09-08-2 | 09/08/2014 | 09/12/2014 | Quality Control | Concrete | View |
| 2014-08-20-19 | 08/20/2014 | 08/29/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
