Project Details
This page displays current information for project DEA: 07245403.
Project Information
| Project Identifiers | Project ID: 7409 DEA: 07245403 EFIS: 0700000431 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-31.1/32.3 |
| Award Date | 02/29/2012 |
| Closeout Date | 10/27/2016 |
| Work Description | Construct Connector between I-10 and I-605 (Design Build Project) LA-10-31.1/32.3, LA-605-R20.2/20.6 |
| Location Description | 10 & 605 IC |
| QA Service Level | 1 (Verified on 03/14/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hassan.azima@dot.ca.gov | Hassan Azima | Resident Engineer | Caltrans RE DB |
| ali.el-zaynab@dot.ca.gov | Ali EL-Zaynab | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-10-06-4 | 10/06/2015 | 10/08/2015 | Quality Control | Concrete | View |
| 2015-06-11-2 | 06/11/2015 | 06/15/2015 | Quality Control | Concrete | View |
| 2015-05-22-1 | 05/22/2015 | 05/26/2015 | Quality Control | Concrete | View |
| 2015-05-20-1 | 05/20/2015 | 05/20/2015 | Quality Control | Concrete | View |
| 2015-05-19-2 | 05/19/2015 | 05/20/2015 | Quality Control | Concrete | View |
| 2015-03-27-6 | 03/27/2015 | 04/01/2015 | Independent Assurance | Concrete | View |
| 2015-04-24-1 | 04/24/2015 | 04/28/2015 | Quality Control | Concrete | View |
| 2015-04-23-1 | 04/23/2015 | 04/23/2015 | Quality Control | Concrete | View |
| 2015-04-16-6 | 04/16/2015 | 04/20/2015 | Quality Control | Concrete | View |
| 2015-04-16-5 | 04/16/2015 | 04/20/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
