Project Details
This page displays current information for project DEA: 07267004.
Project Information
| Project Identifiers | Project ID: 7014 DEA: 07267004 EFIS: 0700000502 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-32.9/39.6 |
| Award Date | 03/27/2012 |
| Closeout Date | 08/03/2023 |
| Work Description | CONSTRUCT MAINTENANCE VEHICLE PULLOUTS AND CONCRETE TEXTURED PAVING. |
| Location Description | LOS ANGELES COUNTY IN MONROVIA, DUARTE, AND AZUSA AT VARIOUS LOCATIONS FROM HUNTINGTON DRIVE UNDERCROSSING TO AZUSA AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 04/24/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Hassan.Azima@dot.ca.gov | Hassan Azima | Resident Engineer | Caltrans RE DB |
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2013-01-07-10000878 | 01/07/2013 | 01/08/2013 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
