Project Details

This page displays current information for project DEA: 043A7714.

Project Information

Project IdentifiersProject ID: 6951
DEA: 043A7714
EFIS: 0400002038
Permit Numbers: 0409NMC1718
DIST-CO-RTE-PM04-ALA--0/13.5
Award Date12/01/2009
Closeout Date09/14/2018
Work DescriptionInstall traffic operation system (TOS) elements at various locations along the Interstate 80 (I-80) corridor from the Bay Bridge to the Carquinze Bridge.
Location DescriptionI-80, various
QA Service Level1 (Verified on 05/14/2012)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
No results found.

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods