Project Details
This page displays current information for project EFIS: 0800000140.
Project Information
| Project Identifiers | Project ID: 6926 EFIS: 0800000140 Permit Numbers: 0811NMC0823 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-15-13/14.3 |
| Award Date | 10/17/2011 |
| Closeout Date | 09/13/2014 |
| Work Description | Enter onto Interstate 15 right-of-way at Clinton Keith Road Interchange in Wildomar area, to reconstruct the interchange including but not limited to re-align the freeway ramps, widen the overcrossing bridge, construct retaining walls, landscape and signal |
| Location Description | Interstate 15, Wildomar |
| QA Service Level | 1 (Verified on 03/12/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nicolesalem@hillintl.com | Nicole Salem | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
