Project Details
This page displays current information for project DIME:6408.
Project Information
| Project Identifiers | Project ID: 6408 Permit Numbers: 1204NMC0530 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-133-4.2-8.1 |
| Award Date | Not set |
| Closeout Date | 09/08/2016 |
| Work Description | Reduce and re-contour two existing stockpiles (Sta 399+25 to 402+30 and Sta 475+80 to 486+25)along the median of Laguna Canyon Rd between SR-73 and I-405. This item will remove approximately 29,650 CY of soil. 2. Remove pile of boulders at Median Stockpile |
| Location Description | Between SR-73 and I-405 |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
