Project Details
This page displays current information for project DEA: 11241924.
Project Information
| Project Identifiers | Project ID: 6052 DEA: 11241924 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-78-20.7/21.3 |
| Award Date | 02/21/2006 |
| Closeout Date | 08/02/2010 |
| Work Description | WIDEN SHOULDER |
| Location Description | IN SAN DIEGO COUNTY NEAR ESCONDIDOFROM SUMMIT DRIVE TO FLORA VISTADRIVE |
| QA Service Level | 1 (Verified on 08/02/2010) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| amir.etezadi@dot.ca.gov | AMIR ETEZADI | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
