Project Details
This page displays current information for project DEA: 100W1804.
Project Information
Project Identifiers | Project ID: 5862 DEA: 100W1804 EFIS: 1000020480 |
---|---|
DIST-CO-RTE-PM | 10-MPA-49-32.96 |
Award Date | 05/16/2011 |
Closeout Date | 07/28/2021 |
Work Description | Construct Solider Pile, MBGR, minor roadway repair |
Location Description | 1.4 mile south of Merced River Bridge |
QA Service Level | 1 (Verified on 02/07/2011) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hassan.jakhar@dot.ca.gov | Hassan Jakhar | Resident Engineer | Caltrans RE DB |
santokh_singh@dot.ca.gov | Santokh Singh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods