Project Details
This page displays current information for project DEA: 08227004.
Project Information
Project Identifiers | Project ID: 5216 DEA: 08227004 |
---|---|
DIST-CO-RTE-PM | 08-SBD-18,38-44.2/44.7 |
Award Date | 12/19/2008 |
Closeout Date | 06/06/2014 |
Work Description | REPLACE BRIDGE AND REALIGN ROADWAY |
Location Description | In San Bernardino County, in the City of Big Bear Lake on Rte 18 at the junction with Rte 38 |
QA Service Level | 1 (Verified on 10/04/2010) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ihab.boulos@dot.ca.gov | Ihab Boulos | Resident Engineer | Caltrans RE DB |
scott_gueltzow@dot.ca.gov | Scott Gueltzow | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods