Project Details
This page displays current information for project DEA: 08468004.
Project Information
Project Identifiers | Project ID: 5197 DEA: 08468004 EFIS: 0800000744 COOP: 12224 Permit Numbers: 0812NDP0909 0811NMC0715 0812NDP0909 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-12.3/14.1 |
Award Date | 11/29/2012 |
Closeout Date | 09/14/2015 |
Work Description | Enter onto Interstate 10 (I-10) right-of-way at Cherry Avenue in the City of Fontana to reconstruct the Cherry Avenue interchange as per plans and specifications date stamped September 14, 2011, per parent permit 08-11-N-MC-0715, and per SWPPP and permit |
Location Description | Cherry Avenue, Fontana |
QA Service Level | 1 (Verified on 12/12/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jrojas@falcon-ca.com | Juan Rojas | Oversight Resident Engineer | Caltrans REO DB |
halfayiz@falcon-ca.com | Hakim Al-Fayiz | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods