Project Details
This page displays current information for project EFIS: 0000001155.
Project Information
| Project Identifiers | Project ID: 4599 EFIS: 0000001155 Permit Numbers: 08056MC0177 08076RT0132 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-79-R9.59/R9.84 |
| Award Date | 03/01/2005 |
| Closeout Date | 07/29/2010 |
| Work Description | WIDEN HIGHWAY,NEW TRAFFIC SIGNAL,INSTALL STORM DRAIN |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
