Project Details
This page displays current information for project DEA: 072159C4.
Project Information
| Project Identifiers | Project ID: 3959 DEA: 072159C4 EFIS: 0700000339 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-001.8/003.0 |
| Award Date | 08/19/2011 |
| Closeout Date | 08/16/2018 |
| Work Description | CARMENITA INTERCHANGE IMPROVEMENT |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM ALONDRA BOULEVARD OVERCROSSING TO SHOEMAKER AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 05/01/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| peter.m.lee@dot.ca.gov | Peter M. Lee | Resident Engineer | Caltrans RE DB |
| bassem_a_kabbara@dot.ca.gov | Bassem Kabbara | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 26 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-06-23-11 | 06/23/2015 | 06/24/2015 | Annual Source Testing | Aggregate | View |
| 2015-04-27-14 | 04/27/2015 | 05/01/2015 | Verification | Concrete | View |
| 2015-04-27-12 | 04/27/2015 | 05/01/2015 | Quality Control | Concrete | View |
| 2015-04-27-11 | 04/27/2015 | 05/01/2015 | Quality Control | Concrete | View |
| 2015-04-27-10 | 04/27/2015 | 05/01/2015 | Quality Control | Concrete | View |
| 2015-04-16-3 | 04/16/2015 | 04/20/2015 | Quality Control | Concrete | View |
| 2015-04-16-2 | 04/16/2015 | 04/17/2015 | Quality Control | Concrete | View |
| 2015-04-16-1 | 04/16/2015 | 04/17/2015 | Quality Control | Concrete | View |
| 2015-03-08-1 | 03/08/2015 | 03/16/2015 | Department Acceptance | Aggregate | View |
| 2015-03-19-5 | 03/19/2015 | 03/24/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
