Project Details
This page displays current information for project DEA: 07189404.
Project Information
| Project Identifiers | Project ID: 3861 DEA: 07189404 Permit Numbers: 07086DP1303 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-71-2.1/3.1 |
| Award Date | Not set |
| Closeout Date | 07/07/2014 |
| Work Description | Constructing a grade separation at the existing at-grade Mission Boulevard and State Route 71 intersection. |
| Location Description | Mission Boulevard and Sr 71 Separation Project. |
| QA Service Level | 2 (Verified on 07/29/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Vito.Cavafian@aecom.com | Gary Cavafian | Structural Representative | Caltrans SR DB |
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
