Project Details
This page displays current information for project EFIS: 0000001155.
Project Information
| Project Identifiers | Project ID: 3749 EFIS: 0000001155 Permit Numbers: 0710NSN1003 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-213-1.221/1.221 |
| Award Date | 06/07/2010 |
| Closeout Date | 10/30/2012 |
| Work Description | Install pull boxes, conduit and traffic signal equipment. |
| Location Description | Western Ave. (Rte. 213), Los Angeles |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
