Project Details
This page displays current information for project DEA: 06395204.
Project Information
| Project Identifiers | Project ID: 3415 DEA: 06395204 Permit Numbers: 0607NSN0359 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-178-R9.4/R12.1 |
| Award Date | Not set |
| Closeout Date | 05/24/2011 |
| Work Description | SR 178 and Fairfax Road Interchange Project |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hisham.alnatour@dot.ca.gov | HISHAM ALNATOUR | Resident Engineer | Caltrans RE DB |
| ltopete@bakersfieldcity.us | Luis Topete | Oversight Resident Engineer | Caltrans REO DB |
| eduardo_reyes@dot.ca.gov | Eduardo Reyes | Structural Representative | Caltrans SR DB |
| Anh.Ly@parsons.com | Anh Ly | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
