Project Details
This page displays current information for project DEA: 05282814.
Project Information
| Project Identifiers | Project ID: 2943 DEA: 05282814 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-150-1 |
| Award Date | 11/14/2006 |
| Closeout Date | 08/10/2010 |
| Work Description | PLANTING AND IRRIGATION |
| Location Description | IN SANTA BARBARA AND VENTURACOUNTIES NEAR CARPENTERIA FROM 1.6KM EAST TO 2.7 KM EAST OF ROUTE 150 AND 101 SEPARATION |
| QA Service Level | 1 (Verified on 08/10/2010) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
