Project Details
This page displays current information for project DEA: 101C7904.
Project Information
| Project Identifiers | Project ID: 215788 DEA: 101C7904 EFIS: 1016000046 |
|---|---|
| DIST-CO-RTE-PM | 10-MER-5-0.4 |
| Award Date | 12/17/2021 |
| Closeout Date | Not set |
| Work Description | BUILDING WORK. |
| Location Description | MERCED COUNTY 0.4 MILE NORTH OF THE FRESNO COUNTY LINE AT THE JOHN "CHUCK" ERRECA SAFETY ROADSIDE REST AREA |
| QA Service Level | 1 (Verified on 06/03/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Zubair.Anwar@dot.ca.gov | Zubair Anwar | Resident Engineer | Caltrans RE DB |
| ramandeep.guraya@dot.ca.gov | Ramandeep "Raman" Guraya | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 48 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-10-27-78 | 10/27/2022 | 10/31/2022 | Quality Control | Concrete | View |
| 2022-10-27-77 | 10/27/2022 | 10/31/2022 | Quality Control | Concrete | View |
| 2023-09-26-1 | 09/26/2023 | 09/27/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-09-06-44 | 09/06/2023 | Stock | SMTL TM3 - Fastener Assembly | View | |
| 2023-09-06-13 | 09/06/2023 | 09/20/2023 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2023-05-25-62 | 05/25/2023 | 05/25/2023 | Quality Control | Concrete | View |
| 2023-06-01-1 | 06/01/2023 | 06/05/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-04-26-78 | 04/26/2023 | 04/26/2023 | Quality Control | Concrete | View |
| 2023-03-22-19 | 03/22/2023 | 03/27/2023 | Quality Control | Concrete | View |
| 2023-03-22-18 | 03/22/2023 | 03/27/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
