Project Details
This page displays current information for project DEA: 01366004.
Project Information
| Project Identifiers | Project ID: 215741 DEA: 01366004 EFIS: 0100000127 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-101-80.0/84.0 |
| Award Date | 12/29/2022 |
| Closeout Date | Not set |
| Work Description | Indianola Cutoff UC |
| Location Description | HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF |
| QA Service Level | 1 (Verified on 05/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| efren.banuelos@dot.ca.gov | Efren Banuelos | Resident Engineer | Caltrans RE DB |
| adlai.evans@dot.ca.gov | Adlai Evans | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 85 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-27-4 | 10/27/2025 | 10/27/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2025-10-09-44 | 10/09/2025 | 10/14/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-10-08-32 | 10/08/2025 | 10/13/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-10-07-41 | 10/07/2025 | 10/13/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-09-17-49 | 09/17/2025 | 09/18/2025 | Quality Control | Polyester | View |
| 2025-09-17-31 | 09/17/2025 | 04/18/2025 | Quality Assurance | Concrete | View |
| 2025-09-15-33 | 09/15/2025 | 09/17/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-09-15-32 | 09/15/2025 | 09/17/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-09-16-31 | 09/16/2025 | 04/17/2025 | Quality Assurance | Concrete | View |
| 2025-09-15-28 | 09/15/2025 | 09/16/2025 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
