Project Details
This page displays current information for project DEA: 07328604.
Project Information
Project Identifiers | Project ID: 215728 DEA: 07328604 EFIS: 0716000180 |
---|---|
DIST-CO-RTE-PM | 07-LA-105-R14.6,R16.4 |
Award Date | 06/14/2021 |
Closeout Date | 07/14/2022 |
Work Description | REMOVE AND INSTALL NEW JOINT ASSEMBLIES AND APPLY WATERPROOFING. |
Location Description | LOS ANGELES COUNTY IN DOWNEY AT PARAMOUNT BOULEVARD OVERCROSSING AND AT ARDIS AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 07/07/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ramon.robillos@dot.ca.gov | Ramon Robillos | Resident Engineer | Caltrans RE DB |
gchoi@prescienceusa.com | Gon Choi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods