Project Details
This page displays current information for project DEA: 060U2704.
Project Information
| Project Identifiers | Project ID: 215711 DEA: 060U2704 EFIS: 0615000295 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-6.2/12.8 |
| Award Date | 06/03/2021 |
| Closeout Date | 10/03/2022 |
| Work Description | REPLACE BRIDGE SIDEWALKS, CONCRETE BARRIERS AND BRIDGE RAILINGS. |
| Location Description | TULARE COUNTY IN AND NEAR EARLIMART AT VARIOUS LOCATIONS FROM AVENUE 48 OVERCROSSING TO AVENUE 100 OVERCROSSING |
| QA Service Level | 1 (Verified on 05/03/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mike.r.garrett@dot.ca.gov | Mike Garrett | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-01-05-10 | 01/05/2022 | 01/06/2022 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
