Project Details
This page displays current information for project DEA: 060T3504.
Project Information
| Project Identifiers | Project ID: 215662 DEA: 060T3504 EFIS: 0615000065 COOP: 061608 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-137-16.6 |
| Award Date | 06/25/2021 |
| Closeout Date | 07/27/2023 |
| Work Description | ROADWAY EXCAVATION, HMA (TYPE A), AND INSTALL SIGNALS. |
| Location Description | TULARE COUNTY IN TULARE AT ROUTE 137/99 SEPARATION |
| QA Service Level | 1 (Verified on 04/16/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mike.r.garrett@dot.ca.gov | Mike Garrett | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-07-14-41 | 07/14/2022 | 07/19/2022 | Department Acceptance | Asphaltic Emulsion | View |
| 2022-06-14-22 | 06/14/2022 | 06/20/2022 | Preliminary | Asphaltic Emulsion | View |
| 2022-06-13-28 | 06/13/2022 | 06/20/2022 | Preliminary | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
