Project Details
This page displays current information for project DEA: 051K7004.
Project Information
| Project Identifiers | Project ID: 215492 DEA: 051K7004 EFIS: 0518000231 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-1-64.4 |
| Award Date | 04/05/2021 |
| Closeout Date | 08/14/2023 |
| Work Description | TREAT EXISTING STRUCTURE WITH ELECTROCHEMICAL CHLORIDE EXTRACTION. |
| Location Description | MONTEREY COUNTY NEAR CARMEL-BY-THE SEA AT GRANITE CANYON BRIDGE |
| QA Service Level | 1 (Verified on 03/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arashdeep.pannu@dot.ca.gov | Arashdeep (Art) Pannu | Resident Engineer | Caltrans RE DB |
| anaime@falcon-ca.com | Alex Naime | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-11-30-62 | 11/30/2021 | 12/02/2021 | Quality Assurance | Rapid Set | View |
| 2022-01-04-9 | 01/04/2022 | 01/04/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
