Project Details
This page displays current information for project DEA: 07293604.
Project Information
| Project Identifiers | Project ID: 215456 DEA: 07293604 EFIS: 0713000238 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-14.3/15.8 |
| Award Date | 05/26/2021 |
| Closeout Date | 07/03/2025 |
| Work Description | CONSTRUCT AUXILIARY LANE AND WIDEN ON AND OFF RAMPS. |
| Location Description | LOS ANGELES COUNTY IN TORRANCE BETWEEN WESTERN AVENUE UNDERCROSSING AND WEST 182ND STREET |
| QA Service Level | 1 (Verified on 07/07/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| samuel.gallardo@dot.ca.gov | Samuel Gallardo | Resident Engineer | Caltrans RE DB |
| james.holloway@dot.ca.gov | James Holloway | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 500 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-17-15 | 08/17/2024 | 08/21/2024 | Acceptance | Aggregate | View |
| 2024-08-20-2 | 08/20/2024 | 08/19/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-17-7 | 08/17/2024 | 08/19/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-07-15-87 | 07/15/2024 | 07/15/2024 | Quality Assurance | Aggregate | View |
| 2024-07-11-101 | 07/11/2024 | 07/11/2024 | Quality Assurance | Aggregate | View |
| 2024-06-27-107 | 06/27/2024 | 06/27/2024 | Quality Assurance | Aggregate | View |
| 2024-07-23-12 | 07/23/2024 | 07/23/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-06-28-84 | 06/28/2024 | 07/01/2024 | Acceptance | Aggregate | View |
| 2024-07-16-14 | 07/16/2024 | 07/16/2024 | Acceptance | Aggregate | View |
| 2024-07-16-12 | 07/16/2024 | 07/16/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
