Project Details
This page displays current information for project DEA: 06360244.
Project Information
| Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
| Award Date | 04/23/2021 |
| Closeout Date | Not set |
| Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/01/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Javier.Huerta@dot.ca.gov | Javier Huerta | Resident Engineer | Caltrans RE DB |
| ramandeep.guraya@dot.ca.gov | Ramandeep Guraya | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 1240 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-03-28-21 | 03/28/2025 | 11/21/2024 | Acceptance | Aggregate | View |
| 2025-03-28-20 | 03/28/2025 | 03/28/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-03-26-43 | 03/26/2025 | 03/26/2025 | Quality Assurance | Soil | View |
| 2025-03-24-58 | 03/24/2025 | 03/24/2025 | Quality Assurance | Soil | View |
| 2025-01-21-5 | 01/21/2025 | 01/21/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2024-11-21-13 | 11/21/2024 | 11/21/2024 | Acceptance | Aggregate | View |
| 2024-11-21-12 | 11/21/2024 | 11/21/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-11-20-2 | 11/20/2024 | 11/20/2024 | Quality Assurance | Soil | View |
| 2024-11-19-3 | 11/19/2024 | 11/19/2024 | Quality Assurance | Soil | View |
| 2024-11-19-2 | 11/19/2024 | 11/19/2024 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
