Project Details
This page displays current information for project DEA: 060R2104.
Project Information
| Project Identifiers | Project ID: 215420 DEA: 060R2104 EFIS: 0614000058 |
|---|---|
| DIST-CO-RTE-PM | 06-MAD-41-6.2/9.2 |
| Award Date | 01/18/2023 |
| Closeout Date | Not set |
| Work Description | FOR CONSTRUCTION ON STATE HIGHWAY IN MADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE |
| Location Description | MADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE |
| QA Service Level | 1 (Verified on 01/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ryan.wilson@dot.ca.gov | Ryan Wilson | Resident Engineer | Caltrans RE DB |
| ramandeep.guraya@dot.ca.gov | Ramandeep Guraya | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 216 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-11-29 | 09/11/2024 | 09/11/2024 | Acceptance | Soil | View |
| 2024-08-22-4 | 08/22/2024 | 07/26/2024 | Acceptance | Soil | View |
| 2024-08-15-44 | 08/15/2024 | 08/17/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-08-15-43 | 08/15/2024 | 08/17/2024 | Acceptance | Aggregate | View |
| 2024-08-15-6 | 08/15/2024 | 08/15/2024 | Quality Assurance | Soil | View |
| 2024-08-15-4 | 08/15/2024 | 08/15/2024 | Quality Assurance | Soil | View |
| 2024-07-26-18 | 07/26/2024 | 07/26/2024 | Acceptance | Soil | View |
| 2024-07-26-17 | 07/26/2024 | 07/26/2024 | Acceptance | Soil | View |
| 2024-07-26-16 | 07/26/2024 | 07/26/2024 | Acceptance | Soil | View |
| 2024-07-26-15 | 07/26/2024 | 07/26/2024 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
