Project Details
This page displays current information for project DEA: 060U4204.
Project Information
| Project Identifiers | Project ID: 215348 DEA: 060U4204 EFIS: 0616000004 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-R4.9/11.6 |
| Award Date | 02/25/2021 |
| Closeout Date | 12/02/2025 |
| Work Description | CONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION. |
| Location Description | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/07/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| chris.wilfong@dot.ca.gov | Chris Wilfong | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 448 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-23-14 | 06/23/2025 | 06/23/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-23-13 | 06/23/2025 | 06/23/2025 | Acceptance | Aggregate | View |
| 2024-10-11-117 | 10/11/2024 | 10/12/2024 | Quality Control | Concrete | View |
| 2024-10-11-116 | 10/11/2024 | 11/12/2024 | Quality Control | Aggregate | View |
| 2024-10-16-14 | 10/16/2024 | 10/17/2024 | Quality Control | Concrete | View |
| 2024-10-16-11 | 10/16/2024 | 10/17/2024 | Quality Assurance | Aggregate | View |
| 2024-10-10-19 | 10/10/2024 | 10/11/2024 | Quality Control | Concrete | View |
| 2024-10-11-1 | 10/11/2024 | 10/11/2024 | Quality Assurance | Aggregate | View |
| 2024-10-10-9 | 10/10/2024 | 10/10/2024 | Quality Assurance | Aggregate | View |
| 2024-08-09-101 | 08/09/2024 | 08/10/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods