Project Details
This page displays current information for project DEA: 101C2804.
Project Information
| Project Identifiers | Project ID: 215093 DEA: 101C2804 EFIS: 1014000134 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-99-30.9/31.3 |
| Award Date | 10/21/2020 |
| Closeout Date | 08/30/2023 |
| Work Description | RAISED BRIDGES, REALIGN RAMPS AND CONSTRUCT AUXILIARY LANE. |
| Location Description | SAN JOAQUIN COUNTY IN LODI FROM 0.4 MILE SOUTH OF ROUTE 12/99 SEPARATION TO 0.3 MILE SOUTH OF TURNER ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/21/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| troy.scheiber@dot.ca.gov | Troy Scheiber | Resident Engineer | Caltrans RE DB |
| ehab.wahed@dot.ca.gov | Ehab Wahed | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-09-08-65 | 09/08/2022 | 10/13/2022 | Department Acceptance | Asphalt Rubber Binder | View |
| 2022-08-31-57 | 08/31/2022 | 10/13/2022 | Department Acceptance | Asphalt Binder | View |
| 2022-09-02-80 | 09/02/2022 | 10/13/2022 | Department Acceptance | Asphalt Binder | View |
| 2022-09-07-92 | 09/07/2022 | 10/13/2022 | Department Acceptance | Asphalt Binder | View |
| 2022-08-30-90 | 08/30/2022 | 10/13/2022 | Department Acceptance | Asphalt Binder | View |
| 2022-08-31-31 | 08/31/2022 | 08/31/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-09-02-36 | 09/02/2022 | 09/02/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-08-31-30 | 08/31/2022 | 08/31/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-03-16-16 | 03/16/2021 | 03/02/2021 | Verification | Hot Mix Asphalt | View |
| 2021-01-26-17 | 01/26/2021 | 01/28/2021 | Verification | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
