Project Details
This page displays current information for project DEA: 051J7804.
Project Information
| Project Identifiers | Project ID: 215038 DEA: 051J7804 EFIS: 0518000052 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-101-61.88/61.88 |
| Award Date | 10/22/2024 |
| Closeout Date | Not set |
| Work Description | SAFETY IMPROVEMENTS |
| Location Description | WELLSONA SAFETY IMPROVEMENTS, SLO 101 |
| QA Service Level | 1 (Verified on 09/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| michael.schmidt@dot.ca.gov | Michael Schmidt | Resident Engineer | Caltrans RE DB |
| neil.weller@dot.ca.gov | Neil Weller | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 46 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-26-8 | 11/26/2025 | 12/01/2025 | Quality Assurance | Concrete | View |
| 2025-10-24-16 | 10/24/2025 | 10/27/2025 | Quality Assurance | Concrete | View |
| 2025-10-17-11 | 10/17/2025 | Quality Assurance | Concrete | View | |
| 2025-04-28-86 | 04/28/2025 | 04/29/2025 | Quality Control | Concrete | View |
| 2025-08-06-76 | 08/06/2025 | 08/06/2025 | Quality Control | Aggregate | View |
| 2025-08-06-75 | 08/06/2025 | 08/06/2025 | Quality Control | Aggregate | View |
| 2025-08-14-8 | 08/14/2025 | 08/14/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2025-07-24-69 | 07/24/2025 | 07/25/2025 | Quality Assurance | Concrete | View |
| 2025-05-27-95 | 05/27/2025 | 05/27/2025 | Quality Control | Aggregate | View |
| 2025-05-27-94 | 05/27/2025 | 05/27/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
