Project Details
This page displays current information for project DEA: 044G6804.
Project Information
| Project Identifiers | Project ID: 214962 DEA: 044G6804 EFIS: 0413000086 Permit Numbers: 04206DP0812 0420NOP0653 |
|---|---|
| DIST-CO-RTE-PM | 04-SCL-280,85-11.2/11.5 |
| Award Date | 03/20/2020 |
| Closeout Date | Not set |
| Work Description | Improve traffic operations by widening existing off-ramp from one land to two lanes; remove curb-and-gutter; remove and replace existing OH sign and street lighting, install concrete barrier, retaining wall, pavement overlay, and new signing and strping |
| Location Description | I-280 between I-280/Foothill Expressway NB off-ramp and SR-85 branch connector |
| QA Service Level | 1 (Verified on 05/12/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nabi.bagheri@dot.ca.gov | Nabi Bagheri | Resident Engineer | Caltrans RE DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
