Project Details
This page displays current information for project DEA: 080A4414.
Project Information
| Project Identifiers | Project ID: 214890 DEA: 080A4414 EFIS: 0818000047 COOP: 081894 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-I-15-17.6/19.6 |
| Award Date | 03/11/2020 |
| Closeout Date | Not set |
| Work Description | Construction consists of additional of two new lanes on Railroad Canyon Road through interchange, reconstruction of the northbound diamond ramps to hook ramps to connect to Grape Street , construction of auxiliary and deceleration lanes on I-15 |
| Location Description | Located at City of Lake Elsinore , 1.6 Mile South to 0.4 Mile North of Railroad Canyon Road undercrossing in Riverside County, CA. |
| QA Service Level | 2 (Verified on 03/26/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Thomas.Guglielmana@dot.ca.gov | Tom Guglielmana | Resident Engineer | Caltrans RE DB |
| carole.sanders@arcadis.com | Carole Sanders | Oversight Resident Engineer | Caltrans REO DB |
| Arvind.K.Patel@dot.ca.gov | Arvind K Patel | Structural Representative | Caltrans SR DB |
| malarcon@trcsolutions.com | Mario Alarcon | Oversight Structural Representative | Caltrans SRO DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-11-10-10 | 11/10/2020 | 11/13/2020 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2020-11-09-11 | 11/09/2020 | 11/12/2020 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
