Project Details
This page displays current information for project DEA: 071XQ304.
Project Information
| Project Identifiers | Project ID: 214828 DEA: 071XQ304 EFIS: 0720000209 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,VARIOUS-var,Various-var, Various |
| Award Date | 04/10/2020 |
| Closeout Date | 11/04/2020 |
| Work Description | Install traffic signals, remove an install back-plates with retro-reflective borders and place " Signal Head" , pavement markings. |
| Location Description | Various Locaitons |
| QA Service Level | 1 (Verified on 05/27/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jose.ferrer@dot.ca.gov | Jose Ferrer | Resident Engineer | Caltrans RE DB |
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
