Project Details
This page displays current information for project DEA: 081H7704.
Project Information
| Project Identifiers | Project ID: 214586 DEA: 081H7704 EFIS: 0817000132 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-215-4.5/5.8 |
| Award Date | 06/10/2020 |
| Closeout Date | 05/26/2022 |
| Work Description | INSTALL SIGN STRUCTURE, HMA, MODIFY RAMP METERING AND RETAINING WALL. |
| Location Description | SAN BENARDINO COUNTY IN SAN BERNARDINO FROM 0.5 MILE SOUTH OR ORANGE SHOW ROAD/AUTO PLAZA DRIVE OVERCROSSING TO 0.2 MILE NORTH OF INLAND CENTER DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 04/16/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nicholas.mineo@dot.ca.gov | Nicholas Mineo | Resident Engineer | Caltrans RE DB |
| sylvia.r.stracner@dot.ca.gov | Sylvia Stracner | Structural Representative | Caltrans SR DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-10 of 21 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-10-04-58 | 10/04/2021 | 10/05/2021 | Quality Assurance | Aggregate | View |
| 2021-09-17-46 | 09/17/2021 | 09/17/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-09-09-46 | 09/09/2021 | 09/08/2021 | Quality Assurance | Aggregate | View |
| 2021-09-17-23 | 09/17/2021 | 09/21/2021 | Per Request | Asphalt Rubber Binder | View |
| 2021-09-17-17 | 09/17/2021 | 09/21/2021 | Verification | Aggregate | View |
| 2021-09-17-16 | 09/17/2021 | 09/20/2021 | Verification | Aggregate | View |
| 2021-09-17-14 | 09/17/2021 | 09/20/2021 | Per Request | Asphalt Binder | View |
| 2021-06-24-30 | 06/24/2021 | 06/24/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-06-24-29 | 06/24/2021 | 06/24/2021 | Quality Assurance | Hot Mix Asphalt | View |
| 2021-06-24-28 | 06/24/2021 | 06/24/2021 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods